HausPipes
Get a Quote
PRICING

Honest pricing, no hidden margins

We don't take rebates from factories. The factory quote you see is the price we paid — our fee is stated separately, every time.

Most common
Commission-based
5% of FOB factory price
$500 minimum per order

Best for: first-time orders, infrastructure projects, or ongoing supply relationships. The 5% covers the full engagement from factory search to delivery.

  • Manufacturer research & shortlisting
  • Factory audit (first order)
  • Price negotiation & PO drafting
  • Production tracking (10% / 50% / 90%)
  • Pre-shipment inspection
  • Logistics & documentation coordination
One-off services
Project-based
Fixed per engagement
From $200 per service

Best for: standalone audits, single inspection visits, or logistics-only coordination.

  • Factory audit: $300–600
  • Pre-shipment inspection: $200–400
  • Supplier research only: $400
  • Logistics coordination: from $200
Long-term clients
Monthly retainer
$1,200–2,500 per month
Minimum 3-month commitment

Best for: distributors or contractors placing multiple orders per quarter.

  • Priority response (same business day)
  • 2 free inspections per month
  • Monthly factory performance report
  • Reduced commission rate (4%)

What we don't do

We don't take rebates or kickbacks from factories
We don't add hidden margins to factory or freight quotes
We don't require long-term contracts for commission work
We don't share your project specs with competitors
We don't use subcontractors for inspections without telling you
We don't recommend factories we haven't audited

Common questions

What is the minimum order value? +

For commission work we typically need a minimum of around $8,000–10,000 FOB order value — below that the economics of a factory audit and third-party inspection don't work out for either side. For sample or trial orders, the practical floor is around 2,000 metres, depending on DN size.

Can I see factory quotes before committing? +

Yes. Every proposal includes itemized factory quotes and our fee separately. You see exactly what the factory charges and what we charge.

Do you only source HDPE pipes? +

Our core focus is HDPE and PVC pipe. We also source steel pipe and steel wire composite pipe on request. We don't source commoditized plumbing fittings or non-pipe products.

Can you handle small quantities like a single container? +

Yes. Many clients are contractors sourcing 1–2 containers for a single project. How much pipe fits in a container depends heavily on DN size — DN110 loads around 1,200–1,400m per 40'HC, while DN400 loads only 100–140m. Contact us with your spec and we'll advise on realistic order sizing.

What certifications can you verify? +

ISO 4427, ISO 4437 (gas), CE marking for the EU, AS/NZS 4130 (Australia/NZ), and BS EN 12201 (UK). We verify the certificate against the issuing body's database, not just the document.

■ Commission from 5% ■ No hidden margins ■ 24-hour response

Have a pipe sourcing project?

Tell us your DN size, SDR, quantity, and destination port. We respond within 24 hours.

Request a Quote → See how it works →